Failover Nodes - Varying Hardware

Giganews Newsgroups
Subject: Failover Nodes - Varying Hardware
Posted by:  Randy (Ran…@discussions.microsoft.com)
Date: Wed, 8 Apr 2009

We are replacing one SQL 2000 cluster node.  The existing two nodes have 4GB
with the /3GB switch - no PAE.  AWE is not enabled.  The new node will have
15.2 GB with PAE.  Should I still use the /3GB switch even though there is
more than 8 GB?

Thanks,
Randy

Replies